滚涂机的装线问题-捕鱼网站

15yearquality

focus on overall solutions for painting equipment

your position:home > industry information

line loading problem of roller coating machine

announcer:高晟机械   release time:2019-9-23 16:55:12

one, roller coating machine line
1. ensure the sealing of the air supply and exhaust pipes in coating, and prevent water leakage and air leakage.
2. the filter cotton on the top of the chamber should be inspected regularly to remove accumulated dust or replace it. clean it every march and replace it once a year.
3. paint fog coagulants shall be added to the circulating pool regularly, and filters, sinks and grilles shall be cleaned frequently. paint mist coagulants are used every two months.
4. the fan belt shall be replaced once every six months, depending on the production situation.
5. the indoor filter bag shall be cleaned once every two weeks, depending on the production situation.
6. in the lubrication mode of rolling coating fan motor, oil shall be timely filled in the oil cup which is rotated once a month. oil shall be filled once every three months when oil is lubricated, and once every two months when butter is lubricated.
two, product chain
1. product chain guide roller and butter lubrication can be added once every six months in batches.
2. add butter to the head of the duck in the chain trolley and lubricate it once every six months.
3. the product chain shall be lubricated by spray once a week for no less than four hours.
4. check the fixing bolts on the tension drive device of product chain once a month
5. the sprockets of the product chain shall be connected to the fixing bolt and its operation shall be observed every day.
three, the ground chain
1. the driving sprocket of the ground chain drive station is lubricated once a month, and the driving chain is lubricated once every two months.
2. the ground chain cover shall be inspected once a week. if the cover is deformed, it shall be leveled in time.
3. check the fixed pin of the ground chain trolley every day, and check whether the fixed pin is in the driving position of the chain before each trolley is put online again.
advantages of roller coating machine:


 滚涂机
1. the full precision single-roll coating machine replaces the traditional spraying, saving time and labor, high efficiency and good environmental protection. relative spraying can save 48.8% of paint;
2. conveyor belt, pu rubber wheel and metering optical wheel are all independent motor frequency conversion speed adjustment, more accurate processing;
3. the product surface treated by the single-roll roller coating machine is smooth with good fullness. there is no heap of paint before and after.
4, coating wheel easy to disassemble and assemble, accurate positioning, height by the count table, to be aware of.

this article is provided by the company foshan gaosheng machinery co., ltd.(https://www.fsgsjx.com). the views of this article does not represent the views of this site.


previous: next:

back to home
related news
  • [2019.08.06]
  • [2019.11.08]
  • [2019.10.06]
  • [2019.11.07]
  • [2019.11.06]
  • [2019.07.10]
  • [2019.09.30]
  • [2019.11.05]
  • [2019.07.02]
  • [2019.08.05]
  • [2019.09.29]
  • [2019.05.10]
  • [2019.05.10]
  • [2019.07.09]
  • [2019.09.28]
  • [2019.08.03]
  • [2019.09.27]
  • [2019.07.08]
  • [2019.05.10]
  • [2019.09.25]
menu
home
about
product
case
video
news
contact
contact

foshan gaosheng machinery co., ltd.

add:  no. 5 xiongxing dongyuan industrial zone, hecun, lishui town, nanhai district, foshan, guangdong fax:  0757-85637852 e-mail:  gs@fsgsjx.com

© 捕鱼网站 copyright 2019 all rights reserved  "));    technology:  

 

—