家具滚涂机的配置说明-捕鱼网站

15yearquality

focus on overall solutions for painting equipment

your position:home > industry information

furniture roller coating machine configuration instructions

announcer:高晟机械   release time:2019-9-27 15:28:17

furniture rolling machine is equipped with imported oil pump, the paint can be recycled through the oil tank, almost no waste; the paint roller is made of japanese imported raw materials, resistant to solvent and good inking effect
 
1. the furniture roller coating machine is mainly applicable to paint roller coating of flat panel, cabinet panel, plane door, metal panel and bamboo and wood shutter curtain.
2. furniture rolling coating machine replaces traditional spraying, saving time and labor, high efficiency and good environmental protection. relative spraying can save 48.8% of paint;
3. conveyor belt, pu rubber wheel and metering optical wheel are all independent motor frequency conversion speed adjustment, more accurate processing;
4. the surface of the products processed by the full precision double-roller roller coating machine is smooth with good fullness. there is no heap of paint before and after.

 滚涂机
5, coating wheel easy to disassemble and assemble, accurate positioning, height by the count table, to be aware of.
matters needing attention of roller coating machine:
1, the coating of the construction of viscosity, construction temperature, rolling machine gap size and transmission speed and other factors will affect the thickness of the film, in the regulation of comprehensive consideration.
2, the rolling coating device should be generally isolated, to avoid the wind blowing and plate on the bad effect of the paint screen.
3. if whiteness is found on the surface of the coating film during the operation, the conveyance shall be stopped immediately to find out the reason.
4. the speed of the conveying device has a great influence on the coating effect. transmission speed is too fast, there will be broken paint curtain drench; the transfer speed is too slow, will cause the surface coating. when there is a break in the flow speed can be lowered or increased spray speed.
5, intermittent coating, if the shutdown time is longer, must be shut down after the paint out, with thinner will drench screen machine and paint pump clean. pay more attention to the use of two components of the solidified coating, so as not to dry the coating system can not be used.

this article is provided by the company foshan gaosheng machinery co., ltd.(https://www.fsgsjx.com). the views of this article does not represent the views of this site.


previous: next:

back to home
related news
  • [2019.11.14]
  • [2019.08.12]
  • [2019.05.10]
  • [2019.11.13]
  • [2019.10.11]
  • [2019.08.15]
  • [2019.11.12]
  • [2019.07.16]
  • [2019.11.11]
  • [2019.10.10]
  • [2019.11.09]
  • [2019.08.10]
  • [2019.11.08]
  • [2019.10.09]
  • [2019.11.07]
  • [2019.05.10]
  • [2019.06.25]
  • [2019.07.15]
  • [2019.11.06]
  • [2019.10.08]
menu
home
about
product
case
video
news
contact
contact

foshan gaosheng machinery co., ltd.

add:  no. 5 xiongxing dongyuan industrial zone, hecun, lishui town, nanhai district, foshan, guangdong fax:  0757-85637852 e-mail:  gs@fsgsjx.com

© 捕鱼网站 copyright 2019 all rights reserved  "));    technology:  

 

—